Home
My Wrekin

Compliant and trusted

Tristar Gully Grates

Our Tristar Gully grate range have been designed to suit all existing gully pot styles and will sit over a typical 450mm Ø circular or horseshoe chamber.

The frame has been designed with an anti-debris feature to stop the backfill material entering the chamber. 

TriStar D400 gully grate render
The Sea Starts Here campaign graphic
Promoting responsibility with Britain's waterways

The Sea Starts Here

We're promoting awareness of a simple but important issue on our most popular Tristar D400 gully gratings. Did you know that waste disposed of down gullies, whether at a roadside or pedestrianised area, can end up in the watercourse. This includes rivers, brooks, becks, ditches, leats and culverts. Ultimately, it has the potential to reach the sea, meaning the sea often really does start here.

In collaboration with a long-standing house building client, we've taken the notable step to include "The Sea Starts Here" as a message on our highest selling Tristar gully gratings. The message serves as a poignant reminder that our actions on land reverberate to our oceans.

An Armadillo gully grate protector shell showing how it protected the grating beneath
The hard hat for your ironwork

Armadillo gully grating

Tristar D400 430x370mm gully gratings are fully compatible with Armadillo protector shells. Armadillo is designed to be placed over manhole covers and gully gratings to provide enhanced protection during the construction phase.

Armadillo provides protection from construction site traffic, including tracked vehicles, and can be easily removed when the final surfacing is completed. This ensures manhole covers and gully grates can start their service life in ‘as new’ condition to optimise longevity.

Related case studies

Related case study

Clicklift saves housing development time and money

Clicklift has proven to be a huge success, after being installed as part of a £50m housing development in north east Scotland. The developers, family-run Guild Homes (Tayside) Ltd, have been so impressed that they have demonstrated the product to construction colleagues - and intend to use it in further developments.

Guild Homes (Tayside) Ltd
Guild Homes (Tayside) Ltd
Read more
Related case study

Scotland’s first ever ClickLift installations

Wrekin has successfully completed five ClickLift™ installations as part of trials for two separate housing developments in Scotland, marking the first time the product has been used outside England. ClickLift™ raises Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing.

Campion Homes, Tough Construction, Dawn Homes
Campion Homes, Tough Construction, Dawn Homes
Read more