ClickLift™ raises Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing. The cover and the frame are also installed at the binding layer level, reducing the likelihood of damage and then, when the finish surface layer is being applied, the manhole cover can be raised with the ClickLift™ frame extender simply and quickly.

In the past year, we have run two successful trials for ClickLift™ in Scotland. The first was at Campion Homes’ Bryony Meadow development in St Andrews, Fife, where groundworkers were ready to begin the raised ironwork stage. After introducing Campion to the product earlier in the year, we were approached by the housing developer to provide a one trial installation, which was completed within a matter of minutes on-site.

This installation marked the first of its kind in Scotland, as ClickLift™ hadn’t previously been used at any other developments. Campion was incredibly happy with the solution we provided to a problem that’s plagued construction sites for decades and it’s now a product it will look to utilise at other developments moving forwards.

Just one week after the installation at Fife, we were approached by Tough Construction, which asked if we could provide ClickLift™ for its Dawn Homes development in Glasgow. This location provided us with the nice challenge of fitting the product to covers sitting at different cambers, which required different depths.

After conducting a mini consultation to ensure the existing manhole covers weren’t damaged and were ready to receive ClickLift™, we identified two covers that were perfect for the trial. These were then successfully fitted, followed by two more installations the following day after an additional request from Tough Construction.

We’re always looking to develop solutions like ClickLift™, which provide an answer to the everyday challenges our customers have, historically, faced on a regular basis and are excited to continue working alongside the likes of Campion Homes, Tough Construction and Dawn Homes for years to come.

Glasgow ClickLift installation

We’re always looking to develop solutions like Clicklift, which provide an answer to the everyday challenges our customers have, historically, faced on a regular basis and are excited to continue working alongside the likes of Campion Homes, Tough Construction and Dawn Homes for years to come.

Richard Stewart

Wrekin Products Ltd.

Related case studies

Related case study

Scotland’s first ever ClickLift installations

Wrekin has successfully completed five ClickLift™ installations as part of trials for two separate housing developments in Scotland, marking the first time the product has been used outside England. ClickLift™ raises Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing.

Campion Homes, Tough Construction, Dawn Homes
Campion Homes, Tough Construction, Dawn Homes
Read more
Related case study

Years of exceptional performance

Our Highway D400 covers are still operating at full capacity after three and a half years of being subjected to high levels of HGV traffic. Meaning the organisation can focus solely on new work, rather than being distracted by manhole covers that have failed prematurely and need fixing or, in some cases, reinstalling.

Scottish Water
Scottish Water
Read more